In some instances "Posi-strut" open web floor joists are used which allows for services such as air-conditioning ducting. In other circumstances Hyspan or Hynebeam joists (which are laminated timber joists) are a better option. Sometimes it is better to raise the height of the area between the existing ceiling and the new floor joists. Each project requires careful consideration in the planning stage of which is the most suitable method. Owners need to select bathroom fittings such as bath tubs, toilet suites and vanity units prior to construction commencement so that the appropriate allowances can be made at the floor joist framing stage. OMara has a special method of construction that is more flexible and allows for future changes but it is still critical that these selections are made at an early stage. Our experience is that quiet often the existing ceiling space can be very dirty. It can contain old dusty insulation, spray-in type insulation, rat vermin, dead birds, birds nests and many other horrible things. We recommend that all owners considering completing a second storey addition that they employ the builder to clean-up the ceiling space. Upon request we can vacuum out completely the existing ceiling, remove all old duct ridden insulation, install new clean insulation and install downlight protectors (which is one of the biggest causes of house fires) prior to installation of the new sheet flooring, This is the only opportunity the owners will have to clean-up this area as it will then be sealed forever after installation of the new floor.
|